Water Resiliency Project

Securing clean, reliable water for Samaritan North Lincoln Hospital — so care never stops, even in a crisis.

Water Is Essential to Hospital Services

Samaritan North Lincoln Hospital is a modern, seismically resilient hospital serving about 25,000 residents on the central Oregon Coast — a number that can double during tourist season. Yet structural strength alone isn’t enough. Surgery, wound care, sanitation, food preparation and infection control all depend on a reliable supply of clean water.

The Water Resiliency Project will secure an independent source so the hospital can keep caring for the community, no matter what.

Earthquake’s Toll on Water & Healthcare

The Oregon Coast sits along the Cascadia Subduction Zone, a 700-mile fault capable of producing a magnitude 9 earthquake and tsunami. A statewide analysis by the Oregon Department of Geology and Mineral Industries projects damages and injuries for Lincoln County:

  • 1,430 estimated injuries countywide
  • 290 of these injuries requiring hospitalization
  • 91% of buildings damaged

These patients would far outnumber the number of hospital beds available locally — at the very same time an earthquake could sever the hospital’s water supply.

The hospital draws water from Lincoln City’s Schooner Creek treatment plant consisting of roughly 135 miles of underground pipe and six power-dependent pump stations, much of it built before modern seismic standards. The hospital has no adequate backup source today.

Land Access Cut Off

After a major quake, the 1973 Siletz River bridge on Highway 101 could be impassable for more than 24 months. Many other bridges and highways leading into Lincoln City from the north and east could also be damaged. This would isolate Lincoln City and force supplies to arrive by sea and air.

On-site water isn’t a convenience; it’s a lifeline.

Line drawing of hospital with water faucet and water drop

The Solution:
A Four-week Supply of Clean Water

The Water Resiliency Project will give Samaritan North Lincoln Hospital its own independent, four-week supply of potable water — a sustainable source that keeps critical care running even if the municipal system fails.

It’s the essential first step in a broader plan to strengthen the hospital against disaster, extending in time to emergency power, fuel, and medical-supply storage.

Why It Matters

Momentum That’s Already Underway

This isn’t a wish list — it’s work already well underway.

  • Relationship building: More than 15 stakeholder relationships have been built, with legislative support advanced through HB 3788 (Rep. David Gomberg and Sen. Dick Anderson).
  • Financial support: Approximately $612,000 have been committed by project partners across the planning and design phases, and $570,000 in construction-phase commitments have been secured from the city of Lincoln City, the North Lincoln Hospital Foundation and the Federal Emergency Management Agency.
  • Planning: Engineering and design advancing toward a shovel-ready project by 2027.
Dr. Lesley Ogden is CEO at Samaritan North Lincoln and Pacific Communities hospitals on the Oregon coast.

 

A Voice From Leadership

“When — not if — this happens, our hospitals and clinics must be prepared to operate independently for weeks. Without a reliable four-week supply of fuel and water, our ability to provide life-saving care will be crippled. Investing in preparedness today means saving lives tomorrow.”

Lesley Ogden, MD, Samaritan Coast Hospitals CEO

""

A Collaborative Effort

The Water Resiliency Project brings together partners committed to the health and safety of Lincoln City:

Samaritan North Lincoln Hospital 

North Lincoln Health District

North Lincoln Hospital Foundation

City of Lincoln City

Dig Deep Research

A Model for Coastal & Rural Resilience

The project mirrors water-resiliency work already underway at Samaritan Pacific Communities Hospital in Newport, and is designed as a replicable model for rural hospitals nationwide that face the same risks.

Protecting this hospital protects everyone who depends on it — the residents it serves and the millions of visitors who pass through the region each year.

Join Us in Building a Lifeline

The Water Resiliency Project is a community effort. A dedicated fund has been established for individuals and organizations who want to help ensure the hospital is ready when it matters most.

circle-chevronemailfacebookSHS AffiliateinstagramlinkedinMyChart IconMyHealthPlan IconphonepinterestSearch Iconsilhouettetwitterxyoutube